A place for Monrovia residents to share updates or information on the progress of this project.
Thursday, September 26, 2013
Monday, September 23, 2013
Thursday, September 19, 2013
Concrete forms in place.
So the steal pilings were driven into the ground, cut off level and now have a concrete form box built around them.
One of the challanges of building a bridge is that you are constantly fighting water. Notice the green pump in the background of this shot.
It was running when I took these pics and I suspect it will run all night. If you look to the right of the box in the shot above, you can see water pouring into the excavation.
Also, a large pit has been installed on the "uphill" side of the creek. I suspect this is in preparation for the pilings and foundation.
Wednesday, September 18, 2013
Tuesday, September 17, 2013
Friday, September 13, 2013
It's Friday at 3pm ...
Do you know where your construction crew is?
I did happened upon this guy and startled him though -
Huh, nor do I.
Friday 9/13/13 at 3pm-ish.
I did happened upon this guy and startled him though -
Sunday, September 8, 2013
Monday, September 2, 2013
Labor Day
Rained last night, just over an inch locally. First big rain on the site since construction started.